Our customers
AKER YARDS Tulcea, Braila, DAEWOO MANGALIA HEAVY INDUSTRIES, SEVERNAV Turnu-Severin
- view picturesPiping fabrication and installing for barges, heavy weight ships, tankers, ice brakers
ALUM S.A. - Tulcea, Romania
- view picturesErection of the Smoke Stack for the 50 Gcal/hour Hot Water Boiler
- view picturesManufacturing of the Static Calcinator Piping
- view picturesPrefabrication and erection of the Static Calcinator Piping
- view picturesPrefabrication and installation of the Air Pre-heater for the 105 tons/hour Steam Boiler
ARPECHIM Refinery - Pitesti, Romania
- view picturesFabrication and assembly of the Steam Recovery Unit SKID
PORT HARCOURT Old Refinery - Nigeria
- view picturesConstruction and erection of the 10,000 cu.m. demi-water tank
- view picturesOverhauling of 20,000 cu.m. PMS floating roof tank
- view picturesTurn Around Maintenance (static equipments, steel structures, testing and painting)
ROMPETROL Refinery - Petromidia, Romania
- view picturesPrefabrication and erection of the 12.5 tons Portal Crane's legs in Coker Unit
- view picturesPrefabrication and erection of the 125C1 Absorbtion Tower in Vacuum Hydrotreater Unit
- view picturesRepairs of the 120H1 heater coil in Naphtha Hydrotreater Unit
- view picturesReplacement of the floating roof with a fixed roof for the 10,000 cu.m. gasoline tank
- view picturesReplacement of the membrane, type walls, convection system and all pipes of the CO Boiler
- view picturesSulzer Packing installation inside the C5 tower in Vacuum Distillation Unit
- view picturesUpper Drum installation of the CO Boiler
TRANSDATA - Romania